Tie Boss
World's Easiset Tie Down! Play Product Video
Tie Boss Home PageTie Boss Superior DesignTie Boss ProductsTie Boss UsesOrder Tie BossTie Boss TestimonialsTie Boss InstructionsTie Boss  Dealer LocatorJaw Boss website
TIEBOSS


Instructions
Securing Loads
 

Set, Lock, Release

1. Attach head hook and tail hook to sturdy locations (separate from load) Select locations that ensure load will be held in place when Tie Boss rope is tightened. Remember a workload secured with Tie Boss Tie Down will only be as strong as to what the hooks are attached.

2. TO SET: Pull free rope until desired tension is obtained, then with same tension lower rope into teeth to automatically lock rope into place.

3. TO LOCK: Always secure rope by locking it under LOCK Tab. Tie Boss recommends tying a double half hitch under lock tab for extra security during transit or storage.

4. TO RELEASE: Before releasing a load, ensure that it will not result in a dangerous shift and that area around is safe. Remove rope from under LOCK Tab. Grip rope and pull with more tension / weight than load and lift it out of teeth at a 45° degree angle, release load by allowing rope to pass through Tie Boss Tie Down.

 



Dealer Login 
 
Notice: When using TIE BOSS, carefully evaluate actual work load prior to use. Do not exceed load limit of TIE BOSS or rope.
Inspect TIE BOSS and rope BEFORE each use. DO NOT USE if damaged. Avoid sharp edges, pinch points, abrasive or hot surfaces.